This week's Qnection is an extended shear plate connection from the Green Coffee Building project, engineered by Francisco J. Herrera G.
An extended shear plate connection avoids coping the beam which reduces the cost of fabrication. Extended shear plates also save on WF material length and can be erected 30% faster.