Qnect Blog

Connecting for Optimization by Jef Sharp in MSC

Written by Pearl Burgoff | Mar 1, 2022 9:55:04 PM

"LAST MONTH, I wrote about how early connected models can help steel fabricators. This month, let’s expand the discussion to include the myriad ways that early connected models help the steel industry as a whole.

At Qnect, we call early connected model delivery projects “ISD” for integrated steel delivery. There are many advantages to integrating the connection engineering, detailing, and optimization of the model before the bidding process begins (which I’ll explore in a second). Using these benefits makes steel less expensive and faster than other building materials—and also more sustainable."

Read on...