Sign In

270 Park Topping-out Ceremony

By Pearl Burgoff on Dec 21, 2023 11:34:32 AM

Qnect CEO Jef Sharp signs the beam at the 270 Park topping-out ceremony. 

Topics: Events News
Continue Reading

QuickQnect® Release Notes: October 2023

By Jeff Hausthor on Nov 13, 2023 10:58:05 AM

  • Connection failed - Fixed issue where the desktop would specify that the main beam had been modified between buttons 1 and 2.
  • Two-sided single angle connection to sloped girder
    • 1. “Rotation” of filler beam limitations, for single angle, double angle and shear plate connectionshould be maximum from vertical of 1:12 (4.76 degrees rotation). This one shown below is toomuch. Should be kicked out with error message saying “Filler beam rotations greater than 1:12 slope from vertical not yet functional in Qnect.”QNT-8495
    • “Rotation” of girder can be whatever is in the model, though as stated above, filler beam should be limited to 1:12 (4.76 degrees).
      QNT-8495 (2)
    • 2.  Double angle rotated filler connections not connecting, but should.QNT-8495 (3)

 

Continue Reading